12 September, 2009

Gumpert build - Day 2

Great work coming along on the apollo. Today was hoses, fluids and some adjusting. The, assembly of the rear end and body panels.
From Gumpert apollo build

From Gumpert apollo build

From Gumpert apollo build

Watch on Monday for the car to be running and on the dyno for shake down.

No comments: